Malvern Scaffolding Using G-DECK DUAL

Facebook
Twitter
LinkedIn
Pinterest
Telegram
WhatsApp
Email

The WeAreMalvern team is always looking at ways to innovate our work at height, safety, and productivity

Three years ago, we decided to invest heavily in a decking system, to work alongside our scaffolding

Now, Malvern Scaffolding is an approved supplier & installer of @GDECK 🚧

Primarily, we bought into the brand to improve the speed of installing single-lift birdcages 💨

After looking at various systems we settled on the G-DECK Dual system 👨🏻‍💻
https://ow.ly/yp2P50QS4MV

There have been so many benefits to the system compared to using tube and fitting scaffolding 👇🏻

✅ Fast to erect/dismantle.
✅ Re-use existing scaffold tubes & fittings.
✅ 600kg per m2 load bearing (strongest system on the planet).
✅ Easily create handrails with tube & fitting.
✅ Can go up to four metres in height.
✅ Less storage needed.

We have found that the improved build time has been the major benefit to our clients – particularly in the housing market

And no loss of safety

We feel G-DECK have been a fantastic company to deal with: never letting us down & offering great aftercare service

They have also been superb at training our operatives to get the most from the product on-site

Thanks to Dave Stanyer-Groves & Ty Wilson 🤝🏻

Leave a Comment

Your email address will not be published. Required fields are marked *

Related Blogs

Scroll to Top